Underpinning prices in Wollongong
This site does not set or quote prices, and no government source we read publishes a price for underpinning a house. What government does publish is what surrounds the job: the licence threshold, the contract rules, the fees to approve it, and the ground and rainfall in Wollongong that make one job differ from the next.
Call (02) 4207 9821Underpinning rules by job value
Type the job's value and the rules that apply to it are highlighted. Each is the NSW Government's own line, with the page it comes from and the date it was read, and every rule is listed below whether or not you type anything.
| Rule | Applies when the job is valued at | Source |
|---|---|---|
| The contractor needs a NSW contractor licence for underpinning and piering work valued at more than A$5,000 in labour and materials, including GST.About underpinning | over A$5,000 | NSW Government, Underpinning and piering work licence · read |
| The builder or tradesperson must give you a written contract when the contract price is over A$5,000, including GST.About underpinning | over A$5,000 | NSW Government, Home building contracts · read |
| Jobs worth more than A$20,000 must be covered by a more extensive written contract, known as a large job contract.About underpinning | more than A$20,000 | NSW Government, Home building contracts · read |
| Your deposit must not exceed 10% of the contract price.About underpinning | any contract price | NSW Government, Home building contracts · read |
| For jobs over A$20,000, the builder or contractor must have home building compensation cover.About underpinning | over A$20,000 | NSW Government, Home building contracts · read |
| The contract must set out a cooling-off period of five clear business days after you are given a copy of it.About underpinning | over A$20,000 | NSW Government, Home building contracts · read |
This fills in the enquiry form below; nothing is sent until you submit it. Your details are handled under this site's Privacy Policy.
This lists each source's own lines as read; it is not legal advice, and it sets no price. The value that counts is the value of the work, including materials, labour and GST.
What moves the size of a job here
Three things about Wollongong change what a job involves before any method is chosen. The first is the ground. The state's soil reports for the units mapped here disagree: the report for the Illawarra Escarpment unit lists mass movement, reactive subsoils and low wet bearing strength and says special foundation designs may be required, while the Fairy Meadow unit's report lists flood hazard, low wet bearing strength and high seasonal watertables and calls its soils generally stable. A lot on the first may need a designed foundation and a lot on the second a plan for water, and those are different jobs. The second is rainfall over time. The Bureau of Meteorology's Wollongong University station, open from 1970 to 2008, recorded a mean of 1323.7 mm a year, a driest year of 752.9 mm in 1994 and a wettest of 1984.5 mm in 1974. It is one campus and not a suburb, but clay that swells and shrinks follows swings like that, so note when a crack opened and whether it grew after a wet or a dry spell. The third is approval. Where Chapter E12 of the council's development control plan applies, the council requires a geotechnical impact assessment report with the application, and a report more than two years old is not accepted unless it is reviewed and certified on form M11. That report is a cost the job carries before anyone digs.
Thresholds that are not up to a quote
NSW sets these by law, whatever a provider charges. A contractor licence is needed once labour and materials pass A$5,000 including GST, and the NSW Government says unlicensed work can be fined A$22,000 for an individual and A$110,000 for a company. Between A$5,000 and A$20,000 the job needs a written small-job contract. Above A$20,000 the contract must state a five-business-day cooling-off period and carry a progress-payment schedule, and the contractor must have home building compensation cover, which you should see proof of before you pay anything. A deposit can be no more than 10% of the contract price. Ask for the licence number and check it before you sign.
Costs and fees by service
- Underpinning
- Foundation Repair
- Wall Crack Repair
- House Levelling
- Restumping
- Resin Injection
- Screw Piles
If a job needs approval, the fees are government's and are published with a date. Wollongong City Council's online fee schedule for 2026/27 lists a planning certificate with additional information at A$185.00 per parcel of land, with the minimum certificate at A$74.00. For a development application to erect a building, carry out work or demolish, it lists A$153.00 where the estimated cost is up to A$5,000, and A$235 plus A$3.00 for each A$1,000 (or part of it) of the estimated cost for A$5,001 to A$50,000. The NSW Planning Portal adds its own fee, separate from council and certifier fees: A$47 for a construction certificate and A$43 to submit a complying development certificate, both for 2026/27. Whether underpinning needs any of these is not settled by the documents we read, so ask the council or a certifier. The council figures were read on 24 September 2026 and the state figures on 25 September 2026; fees reset each 1 July.
Thanks — we have your enquiry. Someone will be in touch shortly. Prefer to talk now? Call (02) 4207 9821.
Last reviewed · Updated · First published